AFCEN nuclear codes for Civil Works (ETC-C and RCC-CW) : Construction

EN BREF
RCC-CW codes are published by AFCEN.
RCC-CW codes (rules for design and construction PWR nuclear civil works) are used to design and build the civil structures of nuclear power plants.
RCC-CW was published in 2010 and 2012 as ETC-C for EPR nuclear power plant.
The most recent RCC-CW editions (2015 to 2019) can be applied to PWR projects.
The training session explains the requirements of the part C Construction of the RCC-CW code.
La formation est délivrée en français.
To present part C of the RCC-CW : Earthworks and soil treatments, concrete, passive reinforcement and post tensioning systems, liners for containments and fuel ponds, sleeves and anchor plates, structural steelwork, topography, tolerances, containment leaklightness and resistance tests.